G+5 Retrofitting Work at Building 1: We started our retrofitting work at Building 1 on 12 August 2020 and handed it over on 09 April 21. In this structure, we did Foundation Retrofitting, Grade Beam Retrofitting, Column Retrofitting, and Beam Retrofitting while production was running. We did all the work on the running floor with proper safety. This was an RSC (ACCORD) Based Project.
Project Location: Ulail, Savar, Dhaka, Bangladesh