Prefabricated Steel Building Drainage System: It was a 3450 running feet RCC drain construction project both inside and outside. The project was started on 11 August 2020 and successfully handed over on 04 December 2020.
Project Location: Taltoli, Hotapara, Gazipur, Bangladesh