RCC Retrofitting & Prefabricated Steel Building Project: We started this project on 14 March 2019. We dismantled the Existing Steel Structure and then we did Pedestal RCC Column Retrofitting Work & the Installation of the Prefabricated Steel Building. We successfully handed over the project on 15 September 2019.
This was an RSC (ACCORD) Based Project for which we got approval.
Project Location: Gorai, Mirzapur, Tangail, Bangladesh