1) Car Parking Shed of Nikki Thai Aluminum Int. Ltd.
Its a Car Parking Shed of Nikki Thai Aluminium Int Ltd., which is Designed & Constructed by SRD Limited.
2) Furnace Shed of Nikki Tahi Aluminum Int. Ltd.
Proposed New Furnace Steel shed of Nikki Tahi Aluminum Int. Ltd.
Construction Work by : SRD Limited
Project Location: Sreepur, Mawna, Gazipur
3) Casting Plant Retrofitting of Nikki Thai Aluminium Int. Ltd.
Casting Plant Retrofitting Work. Retrofitting Member RCC Column, RCC Foundation.
Project Location: Sreepur, Mawna, Gazipur
4) Steel Shed Retrofitting of Active BD Ltd.
SRD Limited did this accessory factory’s DEA, retrofitting drawing, and construction work. The retrofitted items were the column, main beam,sub-beam, stair and bracing installation.
5) New WTP Project of Coca-Cola (Abdul Monem Ltd)
New WTP Project of Coca-Cola (Abdul Monem Ltd). It’s 50ft in Length, 25ft wide & 20ft in Height 22,500 Cubic Feet capacity Water Treatment Plant. Also used pile in the basement. All work is done by steel shutter. Construction work by SRD Limited.
6) Steel Bridge Retrofitting Project of Orion Pharma ltd.
It’s a Steel Bridge Retrofitting Project of Orion Pharma Ltd.Inserted New 4 nos column. Repair the column & beam’s buckling.
Design, Drawing & Construction work by SRD Limited.
7) Water Reservoir project of Saiham Knit Composite Ltd.
It’s a water reservoir project beside the AOP building. Tank Size 23ft x 15ft x10ft =3,450 Cubic Ft capacity tank.
Design, Drawing & Construction by SRD Limited.
8) Lift Core Project of Saiham Knit Composite Ltd.
In an existing building insert the Lift Core at Saiham Knit Composite Ltd.
Architectural Design, Structural Design & Construction work by SRD LIMITED.
9) CIP Tank Retrofitting Project of COCA-COLA (Abdul Monem Ltd.)
It’s a foundation retrofitting project of COCA-COLA (Abdul Monem Ltd.)
10) Central Warehouse Project of Orion Pharma Ltd.
It’s a Central Warehouse Project of Orion Pharma Ltd. RCC & Steel Combined Structure with a Mezzanine floor. Ongoing Construction Project of SRD Limited.
11) New WTP Pile Installation project of Coca-Cola (Abdul Monem Ltd.)
New WTP Pile Installation project of Coca-Cola (Abdul Monem Ltd.). It’s a 450 mm /18″ diameter and (85 ft.) length RCC cast
in situ Pile installation & Mud removal project of Coca-Cola. Successfully handover by SRD limited.
12) Infinia Dyeing & Knitting Mills Ltd.
Civil work of shed Construction at Infinia Dyeing & Knitting Mills Ltd. It’s an extension Project of Infinia Group.
Project Location: Kadamrasul, Sitakunda, Chottogram.
13) Lift Core Project Of Pride Group
Lift Core Project of Pride Group: We built a Lift core between two existing buildings for shifting and lifting products.
Design, Drawing & Construction by SRD Limited
14) AOP Steel Shed Retrofitting of Pride Group
We completed a number of projects at Pride Group which included –
AOP Steel Shed Retrofitting, Boiler Shed Project, Dyeing Shed Project, Rigid Pavement Project, and Unit 3 Shed Building Project.
Project Location: Ulail, Savar, Dhaka, Bangladesh
15) Generator Building Retrofitting Project of Pride Group
Generator Building Retrofitting: We started our retrofitting work at Generator Building on 12 August 2020. In this structure we did Foundation retrofitting, Grade Beam retrofitting, Column retrofitting, and beam retrofitting while production was running. We did all the work on running the floor with proper safety. This was RSC (ACCORD) Based Project.
Project Location: Ulail, Savar, Dhaka, Bangladesh
16) G+6 Storied RCC Building Retrofitting & Vertical Extension Project Of Pride Group
G+6 Retrofitting Work at Building 2: We started our retrofitting project at Building 2 on 23 October 2018 and handed it over on 09 June 2020. It’s a 5-storied building. In this building, we did Foundation Retrofitting, Grade Beam Retrofitting, Column Retrofitting, and Beam Retrofitting. Each floor area was 22,000 sft. We did all the work on running the floor with proper safety. This was an RSC (ACCORD) Based Project for which we successfully got approval.
Project Location: Ulail, Savar, Dhaka, Bangladesh
17) G+5 Storied RCC Building Retrofitting & Vertical Extension Project Of Pride Group
G+5 Retrofitting Work at Building 1: We started our retrofitting work at Building 1 on 12 August 2020 and handed it over on 09 April 21. In this structure, we did Foundation Retrofitting, Grade Beam Retrofitting, Column Retrofitting, and Beam Retrofitting while production was running. We did all the work on the running floor with proper safety. This was an RSC (ACCORD) Based Project.
Project Location: Ulail, Savar, Dhaka, Bangladesh
18) Prefabricated Warehouse Project of Pride Group
Prefabricated Warehouse Project of Pride Group: Over the ETP we constructed a prefabricated steel building project for the warehouse. Building Area 13,325 sqft. This construction work started on 20 January 2019 and was handed over on 15 July 2019.
Project Location: Ulail, Savar, Dhaka, Bangladesh
19) ETP Construction Project of Pride Group
ETP Construction Project: We worked to construct an ETP with Rain Water Harvesting, Fire Control Room, and Biological Reserve Tank System. It’s a 6800 Cubic Meter ETP Tank. This construction work started on 02 November 2017 and was handed over on 20 January 2019. For underground work, we had to use Steel Bracing by I Joist and we had to install shore piles for the protection of nearby structures.
Project Location: Ulail, Savar, Dhaka, Bangladesh
20) RCC Retrofitting & Prefabricated Steel Building Project of Comfit Composite Knit Limited.
RCC Retrofitting & Prefabricated Steel Building Project: We started this project on 14 March 2019. We dismantled the Existing Steel Structure and then we did Pedestal RCC Column Retrofitting Work & the Installation of the Prefabricated Steel Building. We successfully handed over the project on 15 September 2019.
This was an RSC (ACCORD) Based Project for which we got approval.
Project Location: Gorai, Mirzapur, Tangail, Bangladesh
21) Prefabricated Steel Building Drainage System of Bengal Hurricane Group
Prefabricated Steel Building Drainage System: It was a 3450 running feet RCC drain construction project both inside and outside. The project was started on 11 August 2020 and successfully handed over on 04 December 2020.
Project Location: Taltoli, Hotapara, Gazipur, Bangladesh
22) Underground Water Reservoir & Rain Water Harvesting Tank of Bengal Hurricane Group
Underground Water Reservoir & Rain Water Harvesting Tank: This RCC Construction Project started on 27 June 2020. The water tank had two chambers – one for Reservoir and another for Rainwater harvesting. The depth of the tank was 20 feet. During earth excavation work, we used shore protection to save side soil sliding. Due to heavy rainfall, we lost many of our working hours here. The project was handed over on 08 October 2020.
Project Location: Taltoli, Hotapara, Gazipur, Bangladesh
Structural Design & Construction work by SRD LIMITED.
23) Rigid Pavement Construction & RCC Pipe Laying of Dhaka North City Corporation
Rigid Pavement Construction & RCC Pipe Laying: We started this project on 14 February 2020. We worked on the Replacement of the 3 feet diagram Drainage RCC pipe, Reconstruction of Pit & CC Road Construction. All the materials were BUET Standard. The Project was handed over on 08 July 2020.
Project Location: Kakoli Road, Mirpur, Dhaka, Bangladesh
24) Pahartoli Textile & Hosiery Mills of MM Ispahani Ltd.
Pahartoli Textile & Hosiery Mills Project: We built the 3-storied Ispahani Blended Unit 5 with a floor height of 25 feet at each story and an approximate floor area of 75,000 sqft each. This project was started in July 2018 and successfully completed in November 2018.
Project Location: Pahartoli, Chattogram, Bangladesh
25) Steel Truss Shed Retrofitting Project Of KAC Fashion Wear Ltd.
Steel Truss Shed Retrofitting Project: This Steel Truss Retrofitting Work started on 14 March 2019. In the Steel part, there was Steel Truss Retrofitting. We completed the work while production was running with proper safety & completed it on 15 September 2019. This was an RSC (ACCORD) Based Project for which we got approval.
Project Location: 2/13 Tetui Bari, Sarabo, Gazipur, Bangladesh
26) RCC Building Retrofitting Project of KAC Fashion Wear Ltd.
RCC Building Retrofitting Project: This RCC Retrofitting Work started on 14 March 2019. In the RCC part, there was Foundation Retrofitting, Column Retrofitting, and Beam Retrofitting. We completed the work while production was running with proper safety & successfully completed it on 15 September 2019. This was an RSC (ACCORD) Based Project for which we got approval.
Project Location: 2/13 Tetui Bari, Sarabo, Gazipur, Bangladesh
27) Foot over Bridge Dismantling Project of BD Army
Foot Over Bridge Dismantling Project: We started the Foot over Bridge Dismantling work on 10 March 2018 & successfully completed it within 24 March 2018.
In this work, we maintained proper safety measures & Sincerity in the running highway.
Project Location: Jurain, Dhaka, Bangladesh
28) OSL Department Interior Project Of Dhaka University
OSL Department Interior Work: Besides Roof Top Building Works, we did OSL Department Interior Works at Dean Sir’s Room, Office Room, Meeting Room, and Toilet Zone.
Project Location: Business Studies Faculty Building, Dhaka University, Dhaka, Bangladesh
29) Prefabricated Roof Top Classroom and Computer Lab Extension Project of Dhaka University
Prefabricated Roof Top Classroom and Computer Lab Extension Project: At the Faculty of Business Studies Building, over ten stories we constructed a Steel Structure for the purpose of a rooftop classroom and computer lab. We started the work on 11 May 2019 and successfully built the Steel Structure on 14 February 2020. We did the Interior Decoration, CNC Board, PE Sound System, and other work there.
30) Prefabricated Boiler Shed Project Of Dhaka Textile Ltd.
Boiler Shed: We started this Prefabricated Boiler Shed Project in July 2018 and completed it in September 2018.
Project Location: Shambhuganj, Mymensingh, Bangladesh
31) Biological ETP Construction Project of Dhaka Textile Ltd
Construction of ETP: We constructed a Biological ETP Plant with a capacity of 6,000 CUM per day at Dhaka Textile Ltd. Construction work started in January 2018 and was Successfully handover in April 2019.
Project Location: Shambhuganj, Mymensingh, Bangladesh
32) Knitting Building Project of Saiham Knit Composite Ltd.
Three Storied Knitting Building Project of Saiham Knit Composite Ltd. The area of the Building is 49,833Sft. Each Floor having 16,611 Sft (147 x113) & Floor height is 12ft, 17ft, 17ft. The construction work started on 18-10-2021 & the work is ongoing.
Project Location : Saihamnagar, Noyapara, Madhabpur, Sylhet.
Architectural Design, Structural Design & Construction Work by SRD LIMITED
33) Dam Construction Project of Saiham Knit Composite Ltd.
Dam project of Saiham Knit Composite Ltd. The Length of the Dam is 362ft and the height is 8ft.
Design, drawing & Construction by SRD LIMITED.
34) Biological ETP Construction Project of Saiham Knit Composite Ltd.
Biological ETP Tank of Saiham Knit Composite Limited: It’s a 6750 Cubic Meter (271’ x 55’ x 16.5’) RCC ETP Construction work which works started on 10 January 2022 & work is in progress. Project location: Nayapara, Madhabpur, Habiganj, Bangladesh.
Design, drawing & Construction by SRD LIMITED.
35) Prefabricated Steel Bridge Project of Saiham Knit Composite Ltd.
Prefabricated Steel Bridge Project of Saiham Knit Composite Ltd. The length of the bridge is 40ft and the width is 16ft. The bridge has been constructed to develop factory internal communication and easy materials shifting.
36) Conveyer Belt Foundation Of Meghna Group Of Industries Ltd.
Conveyer Belt Foundation work started in August 2017 & successfully completed within September 2017. We successfully did Drainage and Piping systems there too.
Project Location: Meghnaghat, Narayanganj, Dhaka, Bangladesh
37) Silo Base Extension Work Of Meghna Group Of Industries Ltd.
Silo Base Extension Project Work. It started in July 2017 & completed in May 2017
38) RCC Road Construction of Meghna Group Of Industries Ltd.
SRD Limited worked for diverse projects of Meghna Group, Like – as RCC Road Construction commenced in April 2017 & successfully completed in May 2017
39) 7-Storied Steel Stair Dismantling & Reconstruction Work of Niagara Textile Ltd.
We started 7-storied Steel Stair Dismantling & Reconstruction Work in March 2019 & completed it in the same month. This was an RSC (ACCORD) Based Project for which we successfully got approval.
Design, Drawing & Construction by SRD Limited.
40) Rooftop Dining Shed Construction of Niagara Textile Ltd.
We started Rooftop Dining Shed Construction in February 2019 & successfully completed it within February 2019. We Dismantled Existing Column, Reconstructed New Column & Installed Dining Shed with Steel Beam. This was an RSC (ACCORD) Based Project for which we successfully got approval.
41) ETP Construction Project of Niagara Textile Ltd.
Chemical ETP tank of Niagara Textile Limited: It’s a 1,450 Cubic Meter RCC ETP Construction Wor which works started in April 2019 & successfully completed within December 2019. The work was maintained with proper ratio, slum, and clear cover as per drawing.
Project Location: Chandra Circle, Kaliakair, Gazipur, Bangladesh
Design, Drawing & Construction by SRD Limited.
42) 720 Bottling Line Project of COCA-COLA (Abdul Monem Ltd.)
720 Bottling Line Building’s Piling work of 18″ dia 53 ft height 105 nos cast in situ pile construction work Started on 02 March 2022 and Compleated on 14 June 2022.
Construction work by SRD LIMITED
43) PET 3 Warehouse Extension Project of COCA-COLA (Abdul Monem Ltd.)
A Construction of New PET Warehouse Extension project 3rd & 4th Floor of Coca-Cola Abdul Monem Ltd. at AML Beverage Unit, Comilla, Bangladesh. The project area is 20,000 Sft & the Clear Height of the Floor is 14 ft. The 3rd Floor is at 52 ft & 4th Floor is at 66 ft. The Project Construction Started on 25 November 2021 and work is Ongoing.
Construction work by SRD LIMITED
44) WTP Vertical Extension Project of COCA-COLA (Abdul Monem Ltd.)
A Construction of New WTP Extension Project of Coca-Cola Abdul Monem Ltd. at AML Beverage Unit, Comilla, Comilla, Bangladesh. Each Floor Area is 7000 sqft & Floor height is 26 ft. The Project Construction Started on 25 November 2021 and work is ongoing.
Construction work by SRD LIMITED
45) 7-Storied RCC Building Retrofitting of Niagara Textile Limited.
We started RCC Building Retrofitting at the 7-storied Garments Building of Niagara Textiles LTD in October 2018 & completed it within February 2019. Under this project, we did Foundation Retrofitting, Column Retrofitting & Beam Retrofitting Works. We did all the work while production was on with proper safety. This was an RSC (ACCORD) Based Project for which we successfully got approval.
46) Truck Weight Scale Installation Project of Saiham Knit Composite Ltd.
Project Name: Truck Weight Scale Installation
Client: Saiham Knit CompositeLtd.
Weighing scales and systems can help textile manufacturers improve efficiency by measuring incoming raw materials
monitoring each manufacturing stage and weighing the finished product’s outgoing bales.
R.C.C Base Casting area 715 ft
Scale size 45.5′ * 9.5′ *1.33′
47) Printing Building Project of Saiham Knit Composite Ltd.
Project Name: Printing Building Project
Client: Saiham Knit Composite Ltd.
Two-storied RCC printing building.
Floor area -7680 sft.
Total Floor area – 15,360 sft.
48) Chemical Store Building of Saiham Knit Composite Ltd.
49) Prefabricated Steel Warehouse Project of Saiham Suits Ltd.
Prefabricated Steel Warehouse Project: It is a Single storied Prefabricated Steel Structure of 56 feet clear in Height 138 feet in length, 93 ft Wide & area of 12,834 sqft central warehouse. Which was started on 25 April 2019 and was successfully handed over on 10 January 2020. The structure had a connecting bridge linked to the 5-storied RCC Building. This Bridge was built having a Conveyor Belt System to pass the product quickly. Here in the warehouse, Racking System was installed by our sister concern AnH Enterprise Limited. Besides this structure, we built an adjacent fabric store and inspection room. For smooth transportation, we constructed a rigid pavement. We did beautification and landscaping work too. This Building was approved by RSC (ACCORD).
Project Location: Nayapara, Madhabpur, Habiganj, Bangladesh
50) Monowara Hospital (Pvt.) Ltd
Monowara Hospital (Pvt) Ltd.: G+13 Storied RCC Building Construction by SRD Limited.
This Hospital Building construction was started on 13 March 2019. We used a sheet pile for shore protection for basement work. It has two basements. Used for Masonry work Hollow Block & fair face plaster. This project was ended on 09th July 2021
Project Location: 54 Siddheswari Road, Dhaka 1217, Bangladesh
51) Car Parking Project Of Saiham Knit Composite Ltd.
52) AOP Building of Saiham Knit Composite Ltd.