ETP Construction Project of Pride Group
ETP Construction Project: We worked to construct an ETP with Rain Water Harvesting, Fire Control Room, and Biological Reserve Tank System. It’s a 6800 Cubic Meter ETP Tank. This construction work started on 02 November 2017 and was handed over on 20 January 2019. For underground work, we had to use Steel Bracing by I Joist and we had to install shore piles for the protection of nearby structures.
Project Location: Ulail, Savar, Dhaka, Bangladesh