Underground Water Reservoir & Rain Water Harvesting Tank: This RCC Construction Project started on 27 June 2020. The water tank had two chambers – one for Reservoir and another for Rainwater harvesting. The depth of the tank was 20 feet. During earth excavation work, we used shore protection to save side soil sliding. Due to heavy rainfall, we lost many of our working hours here. The project was handed over on 08 October 2020.
Project Location: Taltoli, Hotapara, Gazipur, Bangladesh
Structural Design & Construction work by SRD LIMITED.